Overview

A total of 408 apartments in multi-family buildings, 48 terraced housing units and 3 commercial units will be built in the first stage. All apartments in multi-family buildings will have balconies, apartments on the second floor facing the inner courtyard will have a terrace. Each building will be equipped with a passenger lift. The terraced buildings have been designed as two-story (first floor and first floor), without basement, covered with a flat roof. Some have built-in garages. Facades of individual buildings will be made of textured concrete. Facades made of textured concrete, together with other elements/materials of the facade, constitute a coherent and modern composition. Access to Wrocław by rail: Wrocław Muchobór (IBM, Wrocław Industrial Park) - 17 minutes, Wrocław Główny - 23 minutes by road: Miękinia, Akacjowa Street - Wrocław, Pl. Jana Pawła II - 27km, approx. 40 minutes One should also appreciate the location through the economic potential of the developing Środa County. Many manufacturing plants and companies, both Polish and foreign, are located here. The most important recent investment was announced by Intel, which will erect a Semiconductor Integration and Testing Plant in Softinia. This will create thousands of jobs and attract more investors.
- Status Under construction
- Location Wroclaw and okolice, Miekinia
- Type Residential complex
- Apartments408+48
- Number of buildings15
- Apartment area47 m² - 61 m², 88 m² - 132 m²
- Number of stores1-4
- DeveloperMoj Dom
- Downpayment1%
- InstallmentsIndividually
- Apartment finishingStandart deweloperski
- Construction completion date3kw 2024
- Price Range $1337 - $2350